2.08.2011

feb 8

Shot of John's bike. Main triangle on the jig. DT/HT is brazed BB/DT/ST brazed

Shot of the seat lug in place. Not brazed yet

Seat lug and upper Head Tube lug in place mocked up in jig.
Took forever to shape and sand the Upper HT lug today. I'm guessing 3 hours. Today in all I was able to braze the DT into the BB, Shape and prep the upper HT lug for polish, Miter the TT at the ST and HT. Time worked 11-6 in the shop. Social Media 8-11 hour for dinner Upload photos and blog/twitter 7-9. Typical.

No comments: