Seat lug and upper Head Tube lug in place mocked up in jig.
Took forever to shape and sand the Upper HT lug today. I'm guessing 3 hours. Today in all I was able to braze the DT into the BB, Shape and prep the upper HT lug for polish, Miter the TT at the ST and HT. Time worked 11-6 in the shop. Social Media 8-11 hour for dinner Upload photos and blog/twitter 7-9. Typical.
No comments:
Post a Comment